Operational Cost Reduction for Ori Fresco LTD
Skills
About this project
Project Overview:
My final project for my industrial engineering degree focused on Ori Fresco – a gourmet ice-cream manufacturer and supplier for the Leggenda chain in Israel, among others.
The project, documented extensively in a project book and several spreadsheets, was presented in Hebrew to the university and stakeholders within the organization.
Goal:
The main objective was to reduce operational costs by:
Methodology:
I utilized Excel spreadsheets to analyze data regarding product stock and sales, segmented by suppliers, warehouses, delivery time, costs, dimensions, capacity, and purchasing limitations. The project was particularly focused on the main supplier of raw materials, MEC3 from Italy.
Various models and statistical methods from the industrial engineering field were applied. Additionally, I developed a novel method to calculate the optimal quantity of each product to be purchased and the timing for these purchases. This method considered not only stock levels, demand, and delivery times but also diverse dimensions of each item and its packaging, with all items delivered in a single container with fixed costs. It also accounted for storage costs and limitations, adaptable to real-time changes.
I employed statistical models to measure the time of item collection and to reorganize products on shelves based on demand and dimensions. Furthermore, I calculated shelf locations and dimensions for each product type, categorized by Pareto ABC and COI, and utilized models to predict new item collection times and storage efficiency.
Data visualizations and presentations were used to communicate actual costs, stock distribution, orders, and times compared to predictions after implementing the suggested models using the spreadsheet interface I developed.
Recommendations:
As a result of the analysis, I proposed a new distribution and stock levels of MEC3 products on the main warehouse, which increased the efficiency this warehouse section (30% of total warehouse area) by 78.5% and reduced the time of item collection by 13.5%.
Additionally, I introduced a spreadsheet interface with integrated calculations to optimize the next order from suppliers, adapting to real-time changes. This initiative is predicted to reduce MEC3 stock costs by 48% after 34 weeks and decrease total delivery costs from the MEC3 supplier by 6,648 shekels after the same period.